Factory

Inside the Plant

WHERE EVERY UNIT IS BUILT

From incoming parts to final inspection and container loading, the whole process stays under one roof. Browse the gallery by area, or click any photo to enlarge it.

Quality Gates

FOUR CHECKS BEFORE THE CONTAINER

01

Incoming Parts

Key components are checked on arrival against specifications before entering the assembly line.

02

Line Inspection

Automated assembly stations and operators record critical torque and fitment points along the line.

03

Performance Tests

Braking, lighting, power performance and electrical systems are tested against twenty key criteria.

04

Final & Loading

Full inspection before delivery, then container loading with damage protection for global shipping.

Want to visit the factory or book a video tour?

Book a Visit